This guide breaks down what MIS 3012 actually requires and how it fits alongside your existing PV certification. For the PV side, see how to become a solar PV installer and MCS certification for solar PV installers.
Battery storage is its own standard, not a PV add-on
MIS 3012, "The Battery Installation Standard," covers "the supply, design, installation, set to work and commissioning of electrical energy (battery) storage systems (EESS) for permanent buildings with a maximum power output of up to 50 kW." It must be read alongside the IET Code of Practice for Electrical Energy Storage Systems — a separate reference document from the one PV installers use. In scope: battery storage behind the meter, whether standalone or DC-coupled with solar PV. Out of scope: vehicle batteries, off-grid systems, UPS systems, and leisure-vehicle batteries.
One company certification, but competency assessed per technology
MCS 001-01, the Contractor Standard, lists "Electrical Energy (Battery) Storage Systems" as one of several microgeneration technologies covered under a single MCS Contractor certification, alongside Solar PV, Heat Pumps and others — so you don't need an entirely separate company certification to add battery storage.
What you do need is separately evidenced competency. MCS 025, the Competency Standard, requires Contractors to identify a Nominated Technical Person "for each technology installed by the company," and states that person "must be competent in the technical aspects associated with the technology or technologies that they are responsible for." One person can cover both PV and battery storage, but only by evidencing competency in each separately — holding a PV qualification doesn't automatically qualify you for battery work, and vice versa.
MCS's 2026 "Installer Operating Requirements" (the redeveloped scheme's core document) confirms a practical consequence of this: "A site-based assessment can take place at the same physical location for more than one technology, if the technologies being assessed are installed there" — so adding battery storage to an existing PV certification doesn't mean a wholly separate audit visit, but each technology is still assessed against its own standard.

Scope categories: not all battery systems are assessed the same way
The redeveloped scheme's Installer Operating Requirements sets out two certification scope levels for battery storage, based on the classification system in MIS 3012:
- Limited scope — covers battery storage classes 1, 2 and 3.
- Full scope — covers classes 1 through 4 inclusive, and requires a class 4 system to actually be assessed by your certification body before you can be certified at this level.
This matters for planning: if your business intends to install the full range of battery systems, make sure your certification assessment actually includes a class 4 installation, not just the simpler classes.
The four MCS-approved qualifications
Unlike solar PV, the named qualifications for battery storage aren't listed in an appendix inside MIS 3012 itself — MCS 025 directs readers to its live "Find a Training Course" tool for the current approved list. As of this writing, four Level 3 qualifications are MCS-approved specifically for battery storage:
| Qualification | Awarding body |
|---|---|
| Level 3 Award in the Design, Installation and Commissioning of Electrical Energy Storage Systems | EAL |
| Level 3 Award in the Design, Installation and Commissioning of Small Electrical Energy Storage Systems (2923-34) | City & Guilds |
| Level 3 Award in the Design, Installation and Commissioning of Electrical Energy Storage Systems (Battery Storage) | LCL |
| Electrical Energy Storage Systems (EESS) | BPEC |
Notice these are all design, installation and commissioning qualifications — broader in scope than some of the PV-only awards, and positioned by City & Guilds as continuing professional development "designed for qualified electricians," covering legislation, battery principles, system design, installation, testing and handover. This list can change, so check MCS's live training course tool for the current version before enrolling.
Additional standards that don't apply to PV-only work
Battery storage brings its own electrical and fire-safety requirements, beyond what a PV-only installation needs to meet. MIS 3012 requires designs to account for:
- BS EN IEC 62485-1 and 62485-2 — safety requirements for secondary batteries and stationary battery installations.
- BS EN IEC 62485-5 — additional safety requirements specifically where lithium battery chemistries are used.
- BS EN 60529 — enclosure protection ratings; battery terminals and connections need at least IP2X protection, with top surfaces at IP4X.
- An arc-flash risk assessment, required in accordance with the IET Code of Practice.
Fire safety gets its own dedicated attention in a way PV-only systems don't require: MIS 3012 states storage batteries "shall be located so that a fire in the battery does not compromise" escape routes or other parts of the premises, and chemistry selection must account for fire suppression. Where batteries sit in a frequently visited part of the property, the standard expects fire detection complying with BS 5839-1 (non-domestic) or BS 5839-6 (domestic), integrated with any existing fire alarm system.
Note that BS 7671 (the IET Wiring Regulations) applies to both PV and battery installations — it's not a battery-exclusive requirement, even though it's cited in MIS 3012 too.
Does a battery need its own MCS product listing?
No, and this is a genuine exception worth knowing. The redeveloped scheme's Installer Operating Requirements states that only products with active certification on the MCS Product Directory can generally be installed under the scheme — "the only exception is for battery storage products." So while the installation work itself must meet MIS 3012, the battery product you're fitting doesn't currently need to carry its own MCS product certification the way a PV panel or inverter does.
Does adding a battery affect Smart Export Guarantee eligibility?
Based on how SEG works, the payment is for electricity exported from the generating technology — solar PV — not for the storage itself. We didn't find any MCS or Ofgem requirement that a battery specifically needs its own certification as a condition of a household's SEG eligibility; that eligibility rests on the PV installation and installer being MCS-certified (or certified under an equivalent scheme), with the battery as an addition rather than a separate gate. If SEG eligibility specifics matter for a particular job, it's worth checking directly with Ofgem's current guidance, since supplier-level tariff terms can vary on top of Ofgem's baseline rule.
Common mistakes
- Assuming a PV qualification covers battery storage automatically. It doesn't — MCS 025 requires separately evidenced competency per technology, even for the same Nominated Technical Person.
- Treating battery storage as a simple PV add-on with no extra standards. MIS 3012 brings its own electrical safety standards (the 62485 series) and fire-safety requirements that have no PV equivalent.
- Overlooking the scope-category distinction. Full-scope certification (covering class 4 systems) requires its own assessment — limited-scope certification doesn't automatically extend to the most complex systems.
- Assuming the battery product itself needs MCS listing like a PV panel does. It's explicitly exempted from the general product-listing requirement.
- Checking an outdated qualifications list. The named battery-storage qualifications sit in MCS's live training tool, not a fixed appendix — check the current version before enrolling or advising clients.
Frequently asked questions
Is battery storage certified under the same MCS scheme as solar PV?
Yes, as one of several technologies a single MCS Contractor certification can cover — but competency for each technology has to be evidenced separately, even within the same certified company.
Can the same person be the Nominated Technical Person for both PV and battery storage?
Yes, provided they can evidence competency in each technology separately. There's no rule against one person covering both, but holding a PV qualification alone doesn't satisfy the battery storage competency requirement.
What qualifications are MCS-approved for battery storage?
Four Level 3 awards, from EAL, City & Guilds (2923-34), LCL and BPEC, all covering design, installation and commissioning of electrical energy storage systems. Check MCS's live "Find a Training Course" tool for the current approved list before enrolling.
Does battery storage have extra fire-safety requirements?
Yes. MIS 3012 requires batteries to be positioned so a fire doesn't compromise escape routes, and expects fire detection compliant with BS 5839-1 or BS 5839-6 where batteries sit in frequently visited areas — requirements with no direct equivalent in the PV-only standard.
Does a battery storage product need its own MCS certification, like a solar panel does?
No — battery storage products are explicitly exempted from the general rule that only MCS Product Directory-listed products can be installed under the scheme.
How Nexis Academy can help
Nexis Academy is a City & Guilds Approved Centre (T91185) in Manchester. We currently deliver internal wall insulation training, with more trade and construction courses in development, including solar PV. We do not yet offer solar PV or battery storage qualifications, so please register your interest to hear when that changes.
See also how to become a solar PV installer and MCS certification for solar PV installers.
Sources
- MCS, MIS 3012: The Battery Installation Standard, 2025 edition, issued 1 January 2025 — scope, installation and fire-safety requirements.
- MCS, MCS 001-01: The MCS Contractor Standard Part 1, v4.2.
- MCS, MCS 025: The Competency Standard, v2.0, issued 7 September 2022 — per-technology competency requirement.
- MCS, Installer Operating Requirements, Issue 2.0, 8 September 2026 — battery storage scope categories, product-listing exemption.
- MCS, "Find a Training Course" — current MCS-approved qualifications list.
- City & Guilds, Small Electrical Energy Storage Systems (2923).